Skip to content
Driver at a covered charging station at dusk
Illustrative concept — longer-term development ambition. Not an operating GLX EV Pawa installation.
Fleet charging · in development

Charge the fleet
where it works.

Fleet depot charging is a longer-term development area for GLX EV Pawa. Today we assess depots and advise on what a charging plan would involve; the approach below shows how we would structure it.

How we would approach a fleet.

01Depot chargingChargers sited where vehicles park overnight or between shifts.
02Operational schedulingCharging windows planned around routes, shifts and dwell times.
03Charger sizingPower and number of chargers matched to daily energy need.
04Solar + storage integrationGeneration and battery storage to reduce grid dependence and peak demand.
05MonitoringVisibility of charger status and energy use across the depot.
06Expansion planningInfrastructure designed to grow as more EVs join the fleet.

Plan my fleet.

Tell us how your fleet operates. We will review your schedule and depot and tell you what a charging plan would involve.

Fields marked * are required.